Day 53: All of the ceilings had sheet rock and some of the walls. There was also some new things on the roof as well as the gas meter on the south side of the house.
Day 54: All of the sheet rock finished
Day 53: All of the ceilings had sheet rock and some of the walls. There was also some new things on the roof as well as the gas meter on the south side of the house.
Day 54: All of the sheet rock finished
Day 19:
Yay! we have a basement floor!
The next day they poured the driveway. And then let it all cure over the weekend.
Day 24: They start framing. Bryan is standing next to the support wall that runs the length of our house. The other picture I am standing on the wall of the house looking at where the stairs will be.
Day 25: We have a floor!
Above I am standing next to the cold storage. The left picture is of the opening to the family room and the right picture is of the doorways to the bathroom and one of the bedrooms that will be downstairs.
Above is a view of most of the basement from the south end of the house. Bryan is standing next to a stack of window frames that were in the driveway. On the left I am standing at the bottom of the stairs and Bryan is poking his head out from behind where the stairs will be.